First things first
What will you get when using APCS for concrete batching plants ASA-MIX-1:
• Increasing the speed and accuracy of dosing, which led to an increase of 15-30 m³ per shift.
• Integration of all reporting into the customer’s ERP system.
• Reducing the risk of theft at different stages of production.
• Reducing dosing errors to 0.1%.
• Reducing material consumption up to 4%.
• Improvement of the existing logistics system.
Automation Spirit Alliance helps concrete producers to modernize and adapt the control systems of concrete mixing plants, taking into account all the wishes of the Customer. To achieve these goals, the company's engineers developed a unique technical solution — Control panel ASA-MIX-1.
Adaptive software algorithms allow you to work with any type of equipment, regardless of manufacturer. Remote controller control ASA-MIX-1 has been successfully implemented and shows excellent results on SIMEM, Stetter, MEKA, ELKON, MUSTAM and ELBA equipment.
Upper level:
• Personal computer with 24” monitor.
• Windows 10 Pro or Windows 11.
• SCADA Cimplicity.
• ASA-MIX-1 software.
Lower level (you can choose one of the options):
• Without changing PLC (only PLC software changes).
• Changing only PLC with or without IO modules and weight controllers.
• New control cabinet with PLC, weight controllers, concrete mobility measurer, power breakers, contactors, softstarters.
The Automated Dispatch Center (ADC) is a set of hardware and software tools for controlling plants for the production of concrete mixtures, as well as specialized vehicles involved in the manufacture of such mixtures.
ADC provides centralized access to the management of recipe-based concrete production processes using software and hardware developed by Automation Spirit Alliance.
• Automated control mode with the ability to switch to manual management at any stage of production.
• Implementation of accurate accounting of the fulfillment of requests, excluding theft, as well as integration of reports with ERP.
• Payback period is no more than 1 year.
• Installation of hardware (PLC and operators workstation) and software takes only 1 day.